Birth Of A 50ft Blue Water Yacht #10

September has been extremely busy as we see the deck mould and hull de-moulded. The yard crane is connected and takes the load of the hull whilst the two halves of the mould are disconnected. Each side is removed and moved out of the way to leave the beautifully finished hull. Once free, the design […]