Birth Of A 50ft Blue Water Yacht #11

This month we start lamination on the newly built deck mould and continue to work on the interior of the hull. As systems are being prepared for installation, the prop shaft is installed and holes are cut to install the Kraken V Bracket. The V bracket is placed and heavily bolted through the hull until […]